Silverton Housing Authority Secures $1,097,000 in Grant Funding for Anvil Townhomes Development. Read the full release.

 
0

Anvil Townhomes

Anvil Townhomes - Forged in Community

The SHA believes everyone in our community deserves access to quality built and thoughtfully designed homeownership opportunities in Silverton. We are building move-in ready homes, designed for lasting quality and paired with programs that make homeownership attainable for our community for years to come. 

The Anvil Townhomes are 2- and 3-bedroom, energy efficient, climate hardy, quality finished homes soon to be available for-sale to income qualified households. 

Building and Site Info

Aerial view of the Anvil Townhome Site Plan. The left side of Martha Rose has 4 units with 4 parking spaces facing. The right side of martha rose street has 4 units and 4 parking spaces. Behind those units is a single family home fronting 5th street. The rendering includes sidewalks and trees.

The site plan features two fourplex units and one single-family home with on-site parking and convenient walk-up access. The buildings will be constructed by Fading West Building Systems, a modular manufacturer in Buena Vista that emphasizes quality and efficient building systems. The modular product has been designed to deliver exceptional energy efficiency, which will reduce operating costs for homeowners and comply with Climate Zone 7 requirements.

Conceptual drawing of the 4-plex. The units are two stories with covered front porches.

A table showing the AMI levels and unit bedroom count. There will be one unit with three bedrooms at 140% AMI, 3 units at 100% AMI with 2 bedrooms, 2 units at 100% AMI with 3 bedrooms, and 3 units at 80% AMI with 2 bedrooms.

The Anvil Townhome Development is designed to increase the affordable housing supply in Silverton by 10% in one building season, bringing homeownership opportunities to households that are otherwise priced out of the Silverton housing market. 

The Anvil Townhome Development will fulfill the Town of Silverton's Proposition 123 commitment and aligns with the Town's Compass Master Plan goal of expanding housing choices, opportunities and affordability for the Silverton community.

Location and Accessibility

The design includes one unit built to “visitable” standards with zero-step entries, wider doorways, and accessible bathrooms. Additionally, the unit is adapted for sensory impairment accessibility. 

All project materials, advertising, and outreach will be provided in English and Spanish.

Please contact the Silverton Housing Authority if you require translation services or alternative formats to access information about this program. Contact the SHA.

An aerial image of Anvil Mountain Subdivision looking West with Kendall mountain and the town of Silverton in the background. The Anvil Townhome sites are marked.
Project Location in Anvil Mountain Subdivison

Interested in purchasing a home?

The Anvil Townhome units will soon be available for-sale to income-qualified buyers. The application period has not yet been announced. 

When the application period opens, interested buyers must submit an application to be entered into a drawing. This drawing will determine the Waitlist order, which is the order in which qualified buyers will purchase a home.

Applicants must meet the income requirements for the unit they are applying for and be pre-approved for a mortgage at the home's sale price. Sale prices will be published when the application period is announced. 

Applicants may also earn additional entries into the Waitlist Drawing if they are employed, retired, or living in San Juan County. 

There will be four waitlists: 

  • 3 homes available at 80% AMI (Area Median Income)
  • 3 two-bedroom homes at 100% AMI
  • 2 three-bedroom homes at 100% AMI
  • 1 three-bedroom home at 140% AMI

All homes will be subject to affordability covenants designed to keep them attainable for the community. These covenants require that the home be used as the owner's primary residence and limit the resale value with a 3% annual appreciation cap

If you are interested in applying, review the steps below to check your eligibility and begin preparing your application. 

 

Application Preparation

Step One: Review Income Requirements

Step Two: Review Program Guidelines

  • The Anvil Townhomes have Affordability Covenants that govern the use and sale of the property while you own it. It is important to understand these use restrictions and if they align with your housing preferences and goals. 
  • The Anvil Townhomes Ownership Program is adopted in the Silverton Affordable Housing Guidelines. Interested applicants are encouraged to review the Anvil Townhome Ownership Program requirements prior to applying. 

Step Three: Sign up for the SHA Email List

  • While we do our best to communicate on a variety of outlets, our SHA Email List is where we will share important announcements concerning the development progress and application information. Register for the SHA Email List

Step Four: Take a Homebuyer Education Course 

  • Taking a Homebuyer Education Course is an important step to learn about the mortgage and real estate process and fine-tuning your credit score and budget to ensure you are ready to own a home.
  • We strongly encourage applicants to take a course from HomesFund as they offer significant down-payment assistance which may be the key to unlocking homeownership for you. Visit their website for their class schedule. Otherwise, Housing Resources of Western Colorado will be teaching a course in Spanish in-person in Silverton October 18th (details coming soon). 

Step Five:  Connect with a Mortgage Lender

  • Contact a lender to understand your purchasing budget. You will need a pre-approval letter for the application once the sale prices are released.

Step Six: Stay Informed

  • Watch for the official announcement of the application period opening and sale prices. 
  • If you would like to discuss the program guidelines, affordability covenants, or application process, please contact Anne Chase at achase@silverton.co.us or 970-880-0278. 

Project Timeline

Current Status: Finalizing construction schedule and financing. 

Next Steps: 

  1. Groundbreaking: September 2025
  2. Anticipated Waitlist Application opening: September 2025
  3. Modular Construction: Underway.
  4. Presales: Fall 2025
  5. Certificate of Occupancy: Winter/Spring 2026

Anvil Townhomes Public Meeting Recording

Development Overview

Project History

  1. Request for Proposals Published 3/12/2024 - 4/16/2024.
  2. Proposal Review and Award during 6/10/2024 SHA Meeting.
  3. Signed Predevelopment Agreement with Tributary Development / Fading West Development.
  4. San Juan County conveyed land to SHA 8/28/2024.
  5. Awarded $1,097,000 in grant funding from the Colorado Division of Housing and the Colorado Health Foundation. 
  6. Entered into a Development Agreement with Tributary Development July 2025.
  7. SHA adopted the Anvil Townhome Ownership Program into the Silverton Affordable Housing Guidelines.
  8. Anticipated groundbreaking in September 2025.

Aerial view of the Anvil Townhome Site Plan. The left side of Martha Rose has 4 units with 4 parking spaces facing. The right side of martha rose street has 4 units and 4 parking spaces. Behind those units is a single family home fronting 5th street. The rendering includes sidewalks and trees.
Anvil Subdivision Lots 16 (right) and Lot 17 (left) are proposed for the project. San Juan County conveyed property to SHA on 8/28/2024.

Supporting Partners

This project is made possible by generous local and regional partners committed to bringing affordable homeownership opportunities to Silverton.

The Colorado Health Foundation Logo

Colorado Department of Local Affairs logo

Colorado Department of Public Health and Environment

Town of Silverton logo

San Juan County Colorado logo

Development Partners

The SHA is working with Tributary Development, Fading West Building Systems, and Fading West Construction to bring this project to life.